The Basra Traffic Directorate announced the cutting of the Saad Square bridge and the Intifada area in both directions (back and forth), starting at twelve o’clock at night on Wednesday, July 30, 2025, for a period of fifteen days.
A statement followed by Al-Raya stated that the cutting comes within the framework of paving and maintenance work aimed at improving the infrastructure of the bridge and facilitating traffic later.
The Directorate confirmed that the cutting will be comprehensive throughout the work period, calling on drivers and citizens to take caution and follow the alternative routes announced by the competent authorities to avoid traffic congestion.