The Ministry of Water Resources announced the start of experimental pumping for the project to divert water from the Tigris River via the Suwaib River using the previously dug septic tank to the Kutiban Canal, with the aim of delivering fresh water to the districts of Shatt al-Arab, Abu al-Khasib, al-Faw, and the Siba district, south of Basra Governorate.
A statement followed by Al-Raya stated that the project included the construction of an additional channel to supply the trocar with an amount of water reaching five cubic meters per second through mobile pumps. The statement added that the project work was carried out with intense effort in less than twenty days, and that usable water will be fully pumped within a short period.
The Ministry confirmed that the project will contribute to improving water quality in the districts and districts of southern Basra.