The West Qurna 1 Field Operating Authority announced that production capacity will increase to 670 thousand barrels per day during the next year.
Director of the Authority, Farqad Mustafa, explained that the field is the second largest oil field in the south, pointing out that the development phase began in 2010 through ExxonMobil, and PetroGina continued in 2024 under the same conditions.
He pointed out that the field's current production is 600 thousand barrels per day, with plans to increase production during 2026 to 650-670 thousand barrels per day, with full readiness to maximize production capacity.
He added that the development operations include reclaiming a number of wells and increasing drilling work, with a focus on the Mushrif reservoir and developing work in the Al-Zubair and Al-Saadi reservoirs, in addition to the discovery of six new wells from the Yamama reservoir, three of which are produced without the use of submersibles.
Mustafa confirmed that the total number of wells in the field is 144, while the Mushrif reservoir is considered the largest in number of wells, as it includes about 300 wells for medium and desirable oil in global markets.